The Tilt-Up building process consists in producing on-site concrete walls, which are prepared using the plant’s floor as a cast; then they are tilted up by a crane and put into place.
Tilt-Up building time, from the end of the floor’s concreting process to the end of the assembly, is usually shorter than four weeks. Tilt-Up combines reasonable cost, low maintenance, durability, architectural appeal, and building speed.