The Tilt-Up constructive process consists of producing “on-site” concrete walls which are prepared using the factory floor as mold; subsequently, they are rigging upwards by crane and placed into position.
The Tilt-Up construction time, from the end of floor concreting to the assembly completion, is usually shorter than four weeks. Tilt-Up matches reasonable cost, low maintenance, durability, architectonic appeal, and construction speed.